
8 Switch off the battery disconnect switch.
9 Lock the cab door and all lockable covers.
10 Secure both tracks with wheel chocks (2) and tie
the machine with chains and belts (3) with the
cross tie down procedure to the loading platform
of the trailer.
Unloading
1 Remove the chains, belts and wheel chocks.
2 Raise excavating equipment and dozer blade.
3 Remove the wooden blocks below the
attachment and the dozer blade.
4 Slowly drive to the beginning of the ramp, lift the
excavating equipment position and drive
forwards until the machine tips on to the ramp.
5 Drive down slowly until the machine reaches
level ground.
86
Operating instructions
Transporting machine