33
☆
The drilling of holes in the ceiling must be done by the professional personnel.
(160)
Ceiling
Installation stands for main body of the unit
Above 20
Fig 1
Notes:
The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm
.
E
、
Main body of hoisting air conditioner
[
Fix the hoisting stand firmly
]
Water lever
Tighten (double nuts)
Bolt of one of the angle of outlet pipe is fix
on the angle of the drainage slot
[
Fix the install cardboard
]
[
Fix the gasket firmly
]
Polyethylene pipe
Bolt
(
attachment
)
Center of the ceiling
opening
Bolt
(
attachment
)
Install cardboard
Gasket anchor board
(attachment)
Nut (supplied at scene)
Hoisting stand
Gasket (attachment)
Insert
Fig.2
1
、
The primary step for install the indoor unit.
☆
When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper
and lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break
off.
2
、
Use install cardboard
Summary of Contents for ACP-18CC50GEI
Page 2: ......
Page 3: ...HR BiH Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 56: ......
Page 57: ...SR Korisničko uputstvo RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 110: ......
Page 111: ...CG Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 164: ......
Page 165: ...AL Udhëzime për përdorim RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 218: ......
Page 219: ...MAK Упатства за употреба RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 272: ......
Page 273: ...User manual ENG ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI RoHS ...
Page 274: ...1 1 Names and functions of parts A C P 1 8 C C 5 0 G E I A C P 2 4 C C 7 0 G E I ...
Page 275: ...2 A C P 3 6 C C 1 0 0 G E I ...
Page 276: ...3 2 Safety cautions Read the following carefully to assure safe use ...
Page 277: ...4 ...
Page 291: ...18 TIMER operation procedure ...
Page 293: ...20 How to inser t batteries ...
Page 296: ...23 6 Optimum operation ...
Page 298: ...25 The following are not troubles ...
Page 299: ...26 8 Installation notes ...
Page 300: ...27 9 Care and maintenance Please pull out the power plug after you used the air conditioner ...
Page 301: ...28 ...
Page 302: ...29 ...
Page 303: ...30 ...
Page 325: ...52 70 C The installation altitude beyond the hight of 1000m ...
Page 326: ...53 ...
Page 327: ......
Page 331: ...3 4 ...
Page 334: ...3 4 ...
Page 342: ...3 4 3 4 3 4 ...
Page 343: ......
Page 344: ......
Page 345: ......