
32
6. Make sure that there are enough space for care and maintenance. Make sure that the weight
between the indoor unit and ground is above 1800mm.
7. When installing the steeve bolt, check if the install place can stand the weight 4 times of the unit’s.
If not, reinforce before installation. (Refer to the install cardboard and find where should be
reinforced)
Note
!
There will be lots of lampblack and dust stick on the acentric, heat exchanger and water pump in
dining room and kitchen, which would reduce the capacity of heat exchanger, lead water leakage
and abnormal operation of the water pump.
The following treatment should be taken under this circumstance:
1. Ensure that the smoke trap above cooker has enough capacity to obviate lampblack to prevent the
indraft of the lampblack by the air conditioner.
2. Keep the air conditioner far from the kitchen so that the lampblack would not be indraft by the air
conditioner.
C
、
Important notice
☆
To guarantee the good performance, the unit must be installed by professional personnel according
with this instruction.
☆
Please contact the local Gree special nominated repair department before installation. Any
malfunction caused by the unit that is installed by the department that is not special nominated by
Gree would not deal with on time by the inconvenience of the business contact.
D
、
Dimension of ceiling opening and location of the hoisting screw (M10)
780
(
G
a
ps
betwe
en hoi
s
tin
g s
c
re
w rods
)
84
0(
Indoor uni
t
)
890
*(
Ceil
ing ope
ning
)
95
0(
Dec
o
ra
ted s
u
rfac
e
boards
)
950(
Decorated surface boards
)
890(
Ceiling opening
)
840(
Indoor unit
)
680(
Gaps between hoisting screw rods
)
A
Hoisting screw
(X4)
Refrigerant pipe
Summary of Contents for ACP-18CC50GEI
Page 2: ......
Page 3: ...HR BiH Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 56: ......
Page 57: ...SR Korisničko uputstvo RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 110: ......
Page 111: ...CG Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 164: ......
Page 165: ...AL Udhëzime për përdorim RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 218: ......
Page 219: ...MAK Упатства за употреба RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Page 272: ......
Page 273: ...User manual ENG ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI RoHS ...
Page 274: ...1 1 Names and functions of parts A C P 1 8 C C 5 0 G E I A C P 2 4 C C 7 0 G E I ...
Page 275: ...2 A C P 3 6 C C 1 0 0 G E I ...
Page 276: ...3 2 Safety cautions Read the following carefully to assure safe use ...
Page 277: ...4 ...
Page 291: ...18 TIMER operation procedure ...
Page 293: ...20 How to inser t batteries ...
Page 296: ...23 6 Optimum operation ...
Page 298: ...25 The following are not troubles ...
Page 299: ...26 8 Installation notes ...
Page 300: ...27 9 Care and maintenance Please pull out the power plug after you used the air conditioner ...
Page 301: ...28 ...
Page 302: ...29 ...
Page 303: ...30 ...
Page 325: ...52 70 C The installation altitude beyond the hight of 1000m ...
Page 326: ...53 ...
Page 327: ......
Page 331: ...3 4 ...
Page 334: ...3 4 ...
Page 342: ...3 4 3 4 3 4 ...
Page 343: ......
Page 344: ......
Page 345: ......