27
S
LIDER
/D
AMPER
I
NSTALLATION
:
Place non-locking
nut on rod
Place lock nut
and tighten
Non-locking nut
Slider
Side panel
Push through
the side
Rod through
panel
Figure 40: Slider / damper assembly.
This is used to regulate the airflow through the
pellet stove.
1. Remove the slider rod (short rod with knob and
nuts) from their package and open the left side
panel.
2. Remove the knob and outer nut from the knob.
Push the rod through the hole in the slider.
Place the lock nut on the rod and tighten,
leaving a
1
/
32
” (1 mm) gap between the slider
and the other nut.
3. Make sure the slider moves freely. Close the
side panel and tighten screws after placing the
rod through the panel. Screw the knob onto the
slider.
4. See
O
PERATION
I
NSTRUCTION
- S
LIDER
/D
AMPER
S
ET
-U
P
.
Installation
T
HERMOSTAT
I
NSTALLATION
:
Figure 38: Thermostat wire placement.
1. Install the wall thermostat (12 or 24 Volt rated) in
a location that is not to close too the unit but will
effectively heat the desired area.
2. Connect the Thermostat or Timer using a 2 x 18 gauge
wire from the unit to the thermostat.
If the heat in the room becomes to great, the high limit
switch may turn the stove off and the switch will have to
be manually reset. To reset the high limit switch, remove
the right cabinet side. The switch is found on the air
jacket.
T
HE
T
UBE
S
CRAPER
R
OD
:
Figure 39: Tube scrapper rod
placement.
Put the stainless steel rod through the hole in the heat exchanger
located behind the top louvers. Thread the rod into the scraper plate,
which is visible from inside the firebox by removing the top baffle.
Summary of Contents for VF 100A
Page 35: ...35 Parts Diagram Components...
Page 36: ...Parts Diagram Steel 36...