![Vimar VIGAS 100 Installation & Assembly Manual Download Page 6](http://html1.mh-extra.com/html/vimar/vigas-100/vigas-100_installation-and-assembly-manual_1026937006.webp)
6
Gasifying boilers VIGAS
2.1 DIMENSION CHART AND THE POSITION OF PROTECTIVE SUPPORT PLATE ON
EASILY IGNITABLE FLOOR
2.2 BOILER SCHEMATICS
Pic.1 Pic.2
KEY
1. AK 3000 control
2. Upper door
3. Chimney flap operating rod
4. Fuel bunker
5. Primary air conduction
6. Flap for Lambda control servo
7. Fan
8. Fan cover
9. Heatproof nozzle
10. Secondary air screen
11. Door closing device
12. Fireclay bricks
13. Bottom door
14. Chimney neck
15. Exchanger cap
16. Lighting up damper
17. Upper back cover
18. Outlet water neck
19. Thermal fuse
20. Thermometer
21. Upper front cover
22. Lambda sensor
23. Gases thermometer
24. Exchanger pipes
25. Heat proof /concrete/ filling
26. Secondary air
27. Combustion chamber
28. Direction of gases
29. Neck of reversible water
30. Fillng neck
31. Cleaning flap for 29UD
32. Cleaning hole for 29UD
Scheme VIGAS 60,80
Scheme VIGAS 25
Scheme VIGAS 40
Scheme VIGAS 100
Scheme VIGAS 16
Scheme VIGAS 29 UD
Pic.3
Inlet water neck
for valve (Danfoss)
Hole for
submersible case
(Danfoss)
Exhaust brand of
cooling water
Exhaust water
neck
Inlet water neck
Filling neck
Summary of Contents for VIGAS 100
Page 34: ...34 Gasifying boilers VIGAS ...