© 2011 Viking Preferred Service
87
Service Diagnostics and Procedures–Disassembly
WARNING
To avoid risk of electrical shock, personal injury, or death, disconnect gas supply and electrical power to unit
before servicing. Discharge capacitor through a resistor before attempting to service. Wires removed during
disassembly must be replaced on proper terminals to insure correct earth ground and polarization. After
servicing, reconnect electrical power and gas supply. Before placing appliance into operation, always check
for gas leaks with soapy water solution.
DO NOT
USE AN OPEN FLAME TO CHECK FOR GAS LEAKS.
Landing Ledge–VDSC530T
To access control panel, light switch, gas valves, and
spark module:
1.
Remove knobs and screws securing burner
and oven control bezels.
2.
Open oven door and remove screws securing
landing ledge.
3.
Lift up on control panel to disengage from
keyhole slots.
4.
Lower landing ledge and disconnect control
ribbon and oven light switch wires.
5.
If the control board needs replacing, remove
screws securing oven control to the landing
ledge
(shown below).
If only removing landing
ledge to access other components, simply
unplug the two wires to the oven light switch
and place landing ledge in a secure location.
6.
Repair/replace landing ledge as needed.
7.
Reverse procedure to reinstall.
Screw
Screw
Screw
Screw
Key hole Screw
Control Ribbon
Light Switch Connection
Screw
Screw
Oven Light Switch
Summary of Contents for VDSC530 Series
Page 124: ...Wiring and Schematics Wiring Schematic VDSC530T 4B 124 2010 Viking Preferred Service ...
Page 125: ... 2010 Viking Preferred Service 125 Wiring and Schematics Wiring Schematic VDSC536T 4G ...
Page 126: ... 2010 Viking Preferred Service 126 Wiring and Schematics Wiring Schematic VDSC536T 4Q ...
Page 127: ... 2010 Viking Preferred Service 127 Wiring and Schematics Wiring Schematic VDSC536T 6B ...