In menu option "Commissioning" high-
light the required sub-option with "
V
"
or "
v
" and confirm with "select".
The following functions can be adjusted under menu option
"Commissioning":
Supply auger
The supply auger is started for 6 min.
Supply
The supply and every wand is started
with a purging program subject to the
selected supply system.
Actuator test
In menu option "Actuator test" high-
light the required sub-option with "
V
"
or "
v
" and confirm with "select".
Note
The functions are respectively started
for 1 min. The control unit carries out
a self-test following the termination of
the actuator test.
The following functions can be con-
trolled:
&
Induced draught fan
&
Supply auger
&
Grate shaking
&
Ignition element
&
Ash removal
&
Heating surface cleaner
&
Suction turbine
&
Wand changeover
&
Ventilation/extract air damper
Commissioning
8
Commissioning and adjustment
5692
618
GB
Summary of Contents for Vitolig 300
Page 27: ...Standard control Connection and wiring diagrams 27 Connection and wiring diagrams 5692 618 GB ...
Page 37: ...Parts list cont 37 Parts lists 5692 618 GB ...
Page 38: ...Parts list cont 38 Parts lists 5692 618 GB ...
Page 39: ...Parts list cont 39 Parts lists 5692 618 GB ...
Page 40: ...Parts list cont 40 Parts lists 5692 618 GB ...
Page 41: ...Parts list cont 41 Parts lists 5692 618 GB ...
Page 42: ...Parts list cont 42 Parts lists 5692 618 GB ...