1.
Start up the boiler and check the
combustion.
Flue gas limits
CO
2
content: 8 to 14 % by vol.
CO content
&
with 8% CO
2
: max. 200 ppm
&
with 14% CO
2
: max. 1000 ppm
Flue gas temperature: max. 200 °C
2.
Check the setting and function of
the boiler control unit.
15. Checking the draught
Check the draught inside the flue pipe
(for required draught, see specifica-
tions on page 45).
14. Heating test
21
Inspection and maintenance
5692
618
GB
Summary of Contents for Vitolig 300
Page 27: ...Standard control Connection and wiring diagrams 27 Connection and wiring diagrams 5692 618 GB ...
Page 37: ...Parts list cont 37 Parts lists 5692 618 GB ...
Page 38: ...Parts list cont 38 Parts lists 5692 618 GB ...
Page 39: ...Parts list cont 39 Parts lists 5692 618 GB ...
Page 40: ...Parts list cont 40 Parts lists 5692 618 GB ...
Page 41: ...Parts list cont 41 Parts lists 5692 618 GB ...
Page 42: ...Parts list cont 42 Parts lists 5692 618 GB ...