4.
Rake ash out.
5.
Vacuum the remaining fly ash.
6.
Install clean-out cover
C
and lock
into place.
7.
Insert ash deflector panel
A
.
6. Ash removal
1.
Open l.h. door.
2.
Pull out handle
A
as far as possi-
ble. The side opening is closed.
3.
Release toggle
B
, push container
slightly to the left and remove.
4.
Empty the ash container.
5.
Check gaskets between ash
container and boiler and the gasket
on the lid of the ash container for
tight fit and condition.
6.
Refit the ash container in reverse
order.
7.
Check the function of the automatic
ash removal. For this, press the
reset button and the door contact
switch in the combustion chamber
door.
5. Ash chamber, secondary heating surface
(cont.)
15
Inspection and maintenance
5692
618
GB
Summary of Contents for Vitolig 300
Page 27: ...Standard control Connection and wiring diagrams 27 Connection and wiring diagrams 5692 618 GB ...
Page 37: ...Parts list cont 37 Parts lists 5692 618 GB ...
Page 38: ...Parts list cont 38 Parts lists 5692 618 GB ...
Page 39: ...Parts list cont 39 Parts lists 5692 618 GB ...
Page 40: ...Parts list cont 40 Parts lists 5692 618 GB ...
Page 41: ...Parts list cont 41 Parts lists 5692 618 GB ...
Page 42: ...Parts list cont 42 Parts lists 5692 618 GB ...