50
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
•
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 51
•
4. Filling and venting on the primary side
........................................................................... 51
•
5. Filling and venting on the secondary side
....................................................................... 52
•
•
•
6. Checking expansion vessels and primary circuit/secondary circuit pressure
•
•
•
7. Checking the electrical connections for firm seating
•
............................................................................................... 53
•
•
•
9. Checking the electronic flow switch, type IFM
................................................................ 61
•
•
•
10. Fitting the top panel and front panel (closing the heat pump)
...................................... 62
•
11. Instructing the system user
.............................................................................................. 62
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5838144
Summary of Contents for Vitocal 300-G Pro BW 302.D090
Page 90: ...90 5838144...
Page 91: ...91 5838144...