13
C
Clearances for installation and maintenance:
≥
500 mm
D
Clearance (according to DIN 18101):
≥
944 mm
Note
The electronic injection valve and the compressor wir-
ing chamber are located on the right-hand side.
Anti-vibration base
The heat pump should be sited on a base prepared on
site for the purpose of noise attenuation and even
weight distribution.
Note
In the case of corner installation, enlarge the base by
the minimum clearances (see chapter "Minimum clear-
ances" on page 12).
150
Fig. 5
A
Concrete B25, iron
B
Floor construction, screed
C
Top edge unfinished floor
D
Impact sound insulation as per regulations
E
Pressure-tested sound insulation layer, approx.
10 to 20 mm
F
Heat pump
Pressure points of the heat pump feet
Types BW 302.D090 and BW 302.D110
168
1400
1064
1000
50
709
50
145,5
Fig. 6
ê
Pressure point, foot
E
Pressure-tested sound insulation layer, approx.
10 to 20 mm
F
Front of the heat pump
Preparing for installation
Transport and siting requirements
(cont.)
5838144
Installation