Switch on the ON/OFF switch on the
heat pump control unit.
■ The prompt
"Start commission-
ing?"
appears
automatically
on first
start-up.
Note
The commissioning wizard can also be
started manually:
To do this, press and hold
when
switching on the heat pump control
unit (progress bar visible).
■ When the unit is first commissioned,
the display is in German:
Sprache
Dansk
Cesky
Bulgarski
Deutsch
Wählen mit
ê
ê
ç
DE
BG
CZ
DK
ê
ê
(
■ Manually switching some appliance
components during commissioning
enables the heat pump control unit to
display messages. These are not
appliance faults.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5848 164 GB
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...