35
Equipment required
Pos.
Designation
1
Heat pump I:
2
■ Integral heat pump control unit with LON communication module (ac-
cessory)
■ Integral frost stat, primary circuit
■ Integral flow switch, well circuit
9
Heat pump II:
2
■ Integral heat pump control unit with LON communication module (ac-
cessory)
■ Integral frost stat, primary circuit
■ Integral flow switch, well circuit
qT
2-way motorised valve, heat pump I (fail-safe)
wR
Dirt trap
wT
2-way motorised valve, heat pump II (fail-safe)
wZ
Well pump (suction pump for groundwater, fail-safe; connect to each heat
pump via on-site contactor with MCB/fuse protection)
wU
Delivery well
wI
Return well
Electrical installation scheme
For a summary of electrical connections,
see from page 53 and separate "Con-
nection and wiring diagram".
Heat pump cascade: 1-stage/2-stage
Type BW 301.A090 to 302.A250 and WW 301.A125 to 302.A300
A heat pump cascade consists of a lead
heat pump and lag heat pumps.
Each lag heat pump has a heat pump
control unit. Both the lead and lag heat
pumps can have 2 stages.
The lead heat pump regulates the oper-
ation of the heat pumps within the cas-
cade.
Preparing for installation
Water/water cascade, 1-stage/2-stage
(cont.)
5848 164 GB
Installation
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...