For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Provide information first
................................................ 80
•
•
•
2. Opening the heat pump
.................................................. 80
•
3. Writing reports
................................................................ 81
•
•
•
4. Checking the refrigerant circuit for leaks
..................... 81
•
5. Charging and venting on the primary side
................... 81
•
6. Filling and venting on the secondary side
................... 82
•
7. Charging and venting the solar circuit
......................... 82
•
•
•
8. Checking expansion vessels and the primary circuit/
heating circuit pressure
................................................. 83
•
9. Commissioning the system
........................................... 83
•
•
•
10. Check electronic flow switch, type IFM
........................ 93
•
11. Checking the electronic frost stat, type AC1-2W
......... 95
•
•
•
12. Closing the heat pump
•
13. Instructing the system user
........................................... 97
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5848 164 GB
Service
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...