32
Equipment required
Pos.
Designation
1
Heat pump I
2
Heat pump control unit with LON communication module (accessory)
9
Heat pump II
qT
Primary pump, heat pump I (fail-safe)
Note
For 2-stage Vitocal 300-G Pro, a primary pump can be used for stages 1
and 2 respectively.
wP
Brine safety assembly
wQ
Pressure switch, primary circuit
wW
Brine distributor, geothermal probes/collectors
wT
Primary pump, heat pump II (fail-safe)
Note
For 2-stage Vitocal 300-G Pro, a primary pump can be used for stages 1
and 2 respectively.
wU
Geothermal probes/geothermal collectors
Electrical installation scheme
For a summary of electrical connections,
see from page 53 and separate "Con-
nection and wiring diagram".
Preparing for installation
Primary circuit: brine/water, cascade
(cont.)
5848 164 GB
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...