30
Required equipment
Pos.
Designation
1
Heat pump
2
Heat pump control unit
qT
(First) primary pump (fail-safe)
wP
Brine safety assembly
wQ
Pressure switch, primary circuit
wW
Brine distributor for geothermal probes/collectors
wT
Optional: Second primary pump (fail-safe) for stage 2
Note
■ Contactor relay required.
■ Size first primary pump
qT
for partial load.
wU
Geothermal probes/geothermal collectors
Electrical installation scheme
For a summary of electrical connections, see from page 53 and separate "Con-
nection and wiring diagram".
Preparing for installation
Primary circuit: brine/water, 2-stage
(cont.)
5848 164 GB
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...