18
Minimum clearances
A
B
C D
E
700
600
E
B
A
C D
700
700
600
C D
A
Clearance subject to on-site instal-
lation and location
B
Clearance for installation and main-
tenance (e.g. for removing and
cleaning the tubular heat
exchanger)
■ Type BW:
≥ 500 mm
■ Type WW:
≥ 2000 mm
C
Cable entries.
On-site strain relief clamps required
(wall clearance ≥ 80 mm).
D
■ When using hydraulic connection
accessories (connection set and
Victaulic flange adaptor set, 2½"
or 3" version):
≥ 1000 mm
■ On-site hydraulic connections:
≥ 600 mm
E
■ Without sound insulation parts
(side sections):
≥ 855 mm
Note
When installing cascades, observe the
relevant minimum clearances.
Preparing for installation
Siting
(cont.)
5848 164 GB
Summary of Contents for BW 301.A090
Page 44: ...44 A Frame screw Installation sequence Siting the heat pump cont 5848 164 GB...
Page 157: ...157 5848 164 GB...
Page 158: ...158 5848 164 GB...
Page 159: ...159 5848 164 GB...