Power ON and OFF
1
、
Power On
Before the first time of turning on the unit for operation, please make sure all points listed in the
“Installation and Precaution” section has been studied and followed.
Double check all connections to the unit is correct, and power supply connection to the unit is
proper.
Double check that IDE Hard Disk(s) are connected and installed properly (and formatted
according to procedure as listed in this manual)
Double check the video format of the unit matches the video format of CCTV and monitor.
If all the above double-checking is done without problems, then peripheral equipment can be
powered on..
Once the power is connected to the unit, the power operation LED should be lit.
If the powering down of the unit happened during scheduled recording, then on powering on, the
unit will go into recording automatically.
If the unit is with recording schedule, and the powering on time is within the schedule recording
period, then the recording will start automatically with the schedule recording per-configured
properties.
2
、
Power Off
To power off the unit, operator should stop the recording, exit from configuration menu and any
playback operation first.
Operator should press “
■
” to stop the recording or playback, before powering off the unit.
It is recommended to turn off the unit, before powering down any of the peripheral equipment.
If the unit will be left powered off and not in operation for a long period of time, it is
recommended to unplug it from power source.
The unit should not be powered off during data backup process, in order to prevent data
loss.
The unit should not be powered off during software upgrade process, in order to prevent
failure to restart operation of the unit. In case software upgrade process is interrupted by
accidentally powering off the unit, assistance should be seek from our local agent or regional
representative to repair the unit.
11