2.
Select location for power drive, tool, and pipe
stand . Choose a location that has:
a.
The required power . Consult power drive
manufacturer’s instructions .
b.
The space necessary to adequately
handle the pipe to be grooved .
c.
A level and even surface for power drive,
tool, pipe stand and footing .
3.
Prepare the power drive unit to receive the
VE416FS tool . Remove threading dies, cut off
attachments, etc . from the power drive . Fully
extend the two (2) tubular arms approximately
93/4” beyond the power drive chuck . See
photo below . Secure the support arms in this
position . (Consult power drive manufacturer’s
instructions .)
4.
Fully open the power drive chuck (Consult
power drive manufacturer’s instructions) .
WARNING
• While the tool head assembly is on power
drive arms, without support legs installed,
it is front heavy and may tip over. Have
someone push back on tool head to help
prevent a tip over - until legs are in place
and secure.
5.
Slide tool head/mounting stand assembly as
shown fully onto the power drive arms with drive
lug flange flush up against power drive chuck .
6.
Align notched portions of drive shaft with the
chuck jaws by turning the lower roll .
7.
Tighten the chuck, making sure the jaws fit in
the drive shaft notches .
TM-VE416FS/FSD_7
TM-VE416FS/FSD
OPERATING AND MAINTENANCE INSTRUCTIONS MANUAL
www.victaulic.com
VICTAULIC IS A REGISTERED TRADEMARK OF VICTAULIC COMPANY.
REV_A