Chapter 2 - Installation
2.11 Assembly of Mount
The following procedure provides instructions for assembling the Series 8345
elevation-over-azimuth mount. Three foundation feet are supplied with each
foundation kit. (See foundation instructions for installation of feet.)
NOTE
Before proceeding, be sure that the ground cable has been
attached to a foot of the foundation according to local
grounding codes. (See NOTES in Figures 2-2, 2-3, or 2-4.)
NOTE
For the following procedure tighten all fasteners in steps 1
through 8 only finger tight, then follow step 9 (a through e) for
tightening sequence.
1. As shown in Figure 2-1, place one end of a leg onto a leg
juncture maintaining proper orientation of bend in leg.
Bolt in place with 3/4-10 x 2 1/4-inch bolt, washer, and
nut in two places. Repeat this operation with each of the
six legs and three leg junctures.
42S199F
2-8
Summary of Contents for Series 8345
Page 8: ...Blank Page ...
Page 21: ...Chapter 2 Installation Figure 2 2 Installation of Leg Support Bracket 42S199F 2 11 ...
Page 22: ...Chapter 2 Installation Figure 2 3 Installation of Support Arms 42S199F 2 12 ...
Page 46: ...Chapter 2 Installation Figure 2 15 Installation of LNAs LNBs 42S199F 2 36 ...
Page 47: ...Chapter 2 Installation Figure 2 16 Installation of LNA LNB Cover 42S199F 2 37 ...