23
F
i
g. no. 16 Boiler conversion from the right-hand to left-hand design- fuel reservoir and feeder
disconnection
Fig. no. 17 Boiler conversion from the right-hand to left-hand design – dismantling of burner and
blind flange
1 – Service board
2 – Nut M6 (4 pc)
3 – Washer 6,4 (4 pc)
4 – Screw M6 x 16 (4 pc)
5 – Fuel reservoir
6 – Nut M8 (4 pc)
7 – Washer 8,4 (8 pc)
8 – Screw M8 x 20 (4 pc)
9 – Fuel feeder
10 – Screw M10 x 20 (4 pc)
11 – Washer 10,5 (4 pc)
1 – Basement
2 – Burner
3 – Grate
4 – Screw M10 x 30 (6 pc)
5 – Washer 10,5 (16 pc)
6 – Nut M10 (10 pc)
7 – Blind flange