Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual 

Proprietary and Confidential © 2022 Vertiv Group Corp. 

11 

DC Power Terminals: 

Test Level 

Source 

Impedance 

Performance 

Criteria 

Line to Line 

Line to Ground 

± 500 V 

± 500 V 

2 ohms 

± 800 V 

± 800 V 

2 ohms 

The test method is described in EN 61000-4-5.  In this test the DC-cables 
shall be 5 m long. 

DC Power Port, Common Mode (12 ohms impedance): 

Minimum Peak 

Voltage (volts) 

Voltage Maximum 

Rise/Minimum Decay 

Time (

µ

s) 

Minimum Peak 

Current per 

Conductor (amperes) 

Current Maximum 

Rise/Minimum Decay 

Time (

µ

s) 

Repetitions, each 

Polarity 

±

 1000 

1.2/50 

8/20 

The EUT (Equipment Under Test) shall not be damaged and shall continue to operate properly after the 
application of the first-level surge. 

Requirements on RS485, CAN-bus Signals Are: 

Minimum Peak Voltage 

(volts) 

Voltage Maximum 

Rise/Minimum Decay 

Time (

µ

s) 

Minimum Peak 

Current per 

Conductor (amperes) 

Current Maximum 

Rise/Minimum Decay 

Time (

µ

s) 

Repetitions, each 

Polarity 

±

 1000 (lines to ground) 

10/700 

5/320 

Requirements on CAN-bus signals are 1kV diff. /2kV com. criteria B with 42ohms source impedance. 

According Telcordia GR-1089-CORE issue 7:2017: 

Requirements on CAN-bus signals are: 

Surge 

Minimum Peak 

Voltage (volts) 

Minimum Peak Current 

per Conductor 

(amperes) 

Maximum Rise/ Minimum Decay 

Time for Voltage and Current 

(us) 

Repetitions, each 

Polarity 

Performance 

criterion 

800 

100 

2/10 

1500 

100 

2/10 

 

6.

 

Single Rectifier Audible Noise:  At 25 °C ≤42 dB(A).  Measurement made at 0.6 m distance in front of rectifier and at the 
center of the rectifier. 

7.

 

Overvoltage Category (per IEC/UL62368-1):  III 

8.

 

Power Distribution System:  TN/TT/IT 

9.

 

Pollution Degree:  Degree 3, as per UL/ IEC/EN62368-1. 

Summary of Contents for 1R482000C2-1

Page 1: ...NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Specification Number 1R482000C2 1 1R482000C2 2 1R482000C2 3 Model Number R48 2000C2 BOM 31014424...

Page 2: ...o be used in performing procedures not specifically described in this document The products covered by this instruction manual are manufactured and or sold by Vertiv This document is the property of V...

Page 3: ...ecifications 17 1 6 3 Battery Storage Environment 18 1 6 4 Battery Maintenance 18 1 6 5 Precautions for Battery Use 18 2 Installation 19 2 1 General 19 2 2 Tools Required for Installation 19 2 3 Mount...

Page 4: ...ction Procedure for PG Terminal 57 3 10 2 Customer Wiring Connection Procedure for Quick Connect Terminal 59 3 11 Battery Connections 67 3 11 1 General 67 3 11 2 Battery DB9 Pin Definition 67 3 11 3 R...

Page 5: ...ce Operating System Version Requirements 78 7 3 2 Bluetooth APP 78 8 Troubleshooting and Repair 89 8 1 General 89 8 2 Alarm Conditions Identified by the Controller 89 8 3 Alarm Conditions Identified b...

Page 6: ...inor or moderate injury if not avoided ANSI OSHA This admonition is not used for situations that pose a risk only to equipment data or service even if such use appears to be permitted in some of the a...

Page 7: ...h circuits wiring used to provide power to the system before any AC electrical connections are made Follow local lockout tagout procedures to ensure upstream branch circuit breakers remain de energize...

Page 8: ...fire They may explode Do not open or mutilate batteries ALWAYS FOLLOW THE BATTERY MANUFACTURER S RECOMMENDATIONS AND SAFETY INSTRUCTIONS Specific Precautions for the Batteries Described in this Docum...

Page 9: ...or Electrical Safety in the Workplace Hazardous Voltage DANGER HAZARD OF ELECTRICAL SHOCK More than one disconnect may be required to de energize the system before servicing Handling Equipment Contain...

Page 10: ...megohm resistor no external resistor is necessary Read and follow wrist strap manufacturer s instructions outlining use of a specific wrist strap 3 Do not touch traces or components on equipment conta...

Page 11: ...ct Type with controller 1 Mounting Bracket Part A 2 For pole and wall mounting P N 63240ETT Mounting Bracket Part B 1 For pole mounting only P N 63240ETS Cross Recessed Countersunk Screw 2 For pole mo...

Page 12: ...ector DB 15 Output Customer Side 1 Connector DB 9 I O Customer Side 1 NOTE The rectifier is equipped with plug in customer cable connectors Mating halves to these connectors are furnished as detailed...

Page 13: ...es 20Ah or 50Ah battery 1 Connector DB 9 I O 1 Connector DC 2kW Output 2 1 3 Accessories 1 3 1 Mounting Kits Refer to Table 1 5 Table 1 5 Mounting Kits Part Number Description included with rectifier...

Page 14: ...arked Table 1 7 Customer Wiring Selection EMEA Market P N Description Usage RPM629065 10 IP65 QC RECTIFIER TO BATTERY 2X10 0 8M Battery charge and discharge power cable RPM629065 11 IP65 QC MAIN R RS4...

Page 15: ...d back reducing the voltage as shown in Figure 1 1 so as to limit the current and protect the rectifier The dotted line in Figure 1 1 represents the Fold Back 1 5 Rectifier Specifications The specific...

Page 16: ...7 F This refers to a total of 120 hours in any given year but no more than 15 occurrences in that one year period Other power rating values are as follows refer to Figure 1 3 a At an ambient temperatu...

Page 17: ...ltage does not exceed 1 millisecond 7 Filtering a Voice Band Noise Peak peak voltage is 200 mV at 0 MHZ to 20 MHZ and normal output voltage b Wide Band Noise Wideband noise voltage is 50 mV at 3 4 kHz...

Page 18: ...0 231 17 330 25 2 319 510 03 500 44 0 981 94 39 28 060 50 4 509 991 15 984 13 0 993 96 18 37 550 75 6 740 1480 05 1474 08 0 996 96 47 52 07 100 9 793 2147 70 2143 99 0 998 96 10 83 691 240 0 0 673 16...

Page 19: ...991 96 19 37 531 75 6 748 1481 92 1474 51 0 995 96 46 52 187 100 9 806 2150 63 2146 230 0 998 96 17 82 168 240 0 0 804 193 16 17 36 0 089 17 360 25 2 171 521 01 500 32 0 960 94 28 28 640 50 4 157 996...

Page 20: ...3000 m 5 Surge Protection EN61000 4 5 up to level 4 Telcordia GR 1089 Core issue 7 2017 IEEE C62 41 1999 B3 AC Power Terminals Test Level Source Impedance Performance Criteria Line to Line Line to Gro...

Page 21: ...surge Requirements on RS485 CAN bus Signals Are Minimum Peak Voltage volts Voltage Maximum Rise Minimum Decay Time s Minimum Peak Current per Conductor amperes Current Maximum Rise Minimum Decay Time...

Page 22: ...Connector Circuit Dry Contact Implication Jumper Connection Dry Contact State when Alarm is Active DO1 Fuse Breaker Fail JP1 short pin 1 and 2 Open JP1 short pin 2 and 3 Closed DO2 SPD Alarm Fail JP2...

Page 23: ...t Current Limiting The rectifier has a current limit function The current limit point is factory set at 41 7 A The current limit accuracy is 1 5 A when the output voltage is in the range from 42 VDC t...

Page 24: ...ters 400 Height X 300 Width X 62 Depth b Inches 15 7 Height X 11 8 Width X 2 4 Depth Weight 9 kg Color Vertiv EG123 per RAL9003 Signal white or equivalent Indicators The following indicators are locat...

Page 25: ...Group Corp 15 1 6 Battery 1 6 1 Battery Appearance There are two types of batteries 20AH Battery see Figure 1 7 and Figure 1 8 50AH Battery see Figure 1 9 and Figure 1 10 Figure 1 7 20AH Battery Side...

Page 26: ...e IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 16 Figure 1 9 50AH Battery Side View Figure 1 10 50AH Battery Bottom View RS485 C...

Page 27: ...no less than 700 times When the ambient temperature is 40 the battery pack s 100 DOD cycle life should be no less than 600 times Size 400x300x130mm 400x300x240mm Work Temperature Range 40 55 40 55 Wor...

Page 28: ...he battery pack become dirty wipe them with a dry cloth before use Otherwise the battery pack will have poor contact causing energy loss or failure to charge 1 6 5 Precautions for Battery Use 1 Batter...

Page 29: ...for Installation Refer to Table 2 1 for a list of tools required for installation Table 2 1 Tools Required for Installation Tool Specification Tool Specification Combination wrench hatch club Wrench s...

Page 30: ...ng Kit P N 02236200 for One 1 Rectifier and One 1 Battery Flag Installation This optional kit allows a battery and rectifier to be mounted to a pole or wall in a flag orientation See Figure 2 2 Figure...

Page 31: ...igure 2 3 Figure 2 3 Optional Mounting Kit P N 02236201 for One 1 Rectifier and One 1 Battery Flat Installation Torx Head Screw M6 16 26020795 8X Connector 631200J1 1X Torx Head Screw M6 16 26020795 2...

Page 32: ...r and mounting accessories and kits 2 Install the mounting bracket 63240ETT in the appropriate top position on the pole with the supplied pole mount band Securely tighten the pole mount band to the po...

Page 33: ...ets to the Rear Panel of the Rectifier Flag Figure 2 6 Installing the Mounting Brackets to the Rear Panel of the Rectifier Flat Mounting bracket P N63240ETS M6 10 P N 26020778 2X Torque 5Nm M6 16 P N...

Page 34: ...nfidential 2022 Vertiv Group Corp 24 Figure 2 7 Securing the Rectifier to the Pole at the Top Flag Figure 2 8 Securing the Rectifier to the Pole at the Top Flat Hook the hanger in the bracket slot M6...

Page 35: ...Manual Proprietary and Confidential 2022 Vertiv Group Corp 25 Figure 2 9 Securing the Rectifier to the Pole at the Bottom Flag Figure 2 10 Securing the Rectifier to the Pole at the Bottom Flat Pole mo...

Page 36: ...appropriately sized holes for the customer provided M10 wall anchors being used into the wall as shown in Figure 2 11 Install the M10 wall anchors into the holes Figure 2 12 3 Install the mounting br...

Page 37: ...idential 2022 Vertiv Group Corp 27 Figure 2 13 Installing the Mounting Brackets to the Rectifier Flag Figure 2 14 Installing the Mounting Brackets to the Rectifier Flat M6 16 P N 26020779 4X Torque 5N...

Page 38: ...or Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 28 Figure 2 15 Installing the Rectifier to the Wall Flag Figure 2 16 Installing the Rectifier to the Wall...

Page 39: ...tomer needs to supply four 4 wall anchors capable of supporting the weight of the rectifier and battery NOTE If the rectifier s front access panel is opened during installation ensure the access panel...

Page 40: ...Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 30 Figure 2 17 Install Mounting Brackets to Pole Figure 2 18 Install Mounting Brackets...

Page 41: ...Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 31 Figure 2 19 Install Mounting Brackets to Rectifier Figure 2 20 Install Li ion Battery to Pole M8...

Page 42: ...tiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 32 Figure 2 21 Install Rectifier to Pole M6 16 P N 26020795 2X Torque 5...

Page 43: ...stomer provided M10 wall anchors being used into the wall as shown in Figure 2 22 Install the M10 wall anchors into the holes Figure 2 23 3 Install mounting bracket to wall Refer to Figure 2 24 4 Inst...

Page 44: ...ual Proprietary and Confidential 2022 Vertiv Group Corp 34 Figure 2 24 Install Mounting Bracket to Wall Figure 2 25 Install Mounting Bracket to Li ion Battery M10 Torque 40 Nm Mounting bracket P N 633...

Page 45: ...User Manual Proprietary and Confidential 2022 Vertiv Group Corp 35 Figure 2 26 Install Mounting Bracket to Rectifier Figure 2 27 Install Li ion Battery to Wall Mounting bracket P N 21243139 Small M6...

Page 46: ...customer needs to supply four 4 wall anchors capable of supporting the weight of the rectifier and battery NOTE If the rectifier s front access panel is opened during installation ensure the access pa...

Page 47: ...ifier Refer to Figure 2 33 7 Install Li ion battery to pole Refer to Figure 2 34 8 Install rectifier to Li ion battery Refer to Figure 2 35 9 Install bottom mounting screws to rectifier Tighten top an...

Page 48: ...idential 2022 Vertiv Group Corp 38 Figure 2 30 Install Li ion Battery Optional Mounting Bracket if required Figure 2 31 Install Pole Mounting Bracket to Li ion Battery Mounting Bracket battery flat in...

Page 49: ...Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 39 Figure 2 32 Install Rectifier Mounting Bracket to Li ion Battery M6 16 P N 26020779 4X Torque 5 Nm...

Page 50: ...or Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 40 Figure 2 33 Install Top Mounting Screws to the Rectifier M6 16 P N 26020795 2X Keep the distance betwee...

Page 51: ...lation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 41 Figure 2 34 Install Li ion Battery to Pole Figure 2 35 Install Rectifier to Li Battery Screws hang into their slots along...

Page 52: ...nfidential 2022 Vertiv Group Corp 42 Figure 2 36 Install Bottom Mounting Screws to Rectifier and Tighten Top and Bottom Rectifier Mounting Screws Figure 2 37 Install Rectifier and Li ion Battery Conne...

Page 53: ...ure 2 40 4 Install Li ion battery optional mounting bracket if required Refer to Figure 2 41 5 Install wall mounting bracket to Li ion battery Refer to Figure 2 42 6 Installing rectifier mounting brac...

Page 54: ...User Manual Proprietary and Confidential 2022 Vertiv Group Corp 44 Figure 2 40 Install Mounting Bracket to Wall Figure 2 41 Install Li ion Battery Optional Mounting Bracket if required M10 Torque 40 N...

Page 55: ...onfidential 2022 Vertiv Group Corp 45 Figure 2 42 Install Wall Mounting Bracket to Li ion Battery Figure 2 43 Install Rectifier Mounting Bracket to Li ion Battery Mounting bracket Big P N 21243067 M8...

Page 56: ...door Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 46 Figure 2 44 Install Top Mounting Screws to Rectifier M6 16 P N 26020795 2X Keep the distance between...

Page 57: ...tion and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 47 Figure 2 45 Install Li ion Battery to Wall Figure 2 46 Install Rectifier to Li ion Battery M8 16 P N 26020780 2x Torque 12 N...

Page 58: ...nfidential 2022 Vertiv Group Corp 48 Figure 2 47 Install Bottom Mounting Screws to Rectifier and Tighten Top and Bottom Rectifier Mounting Screws Figure 2 48 Install Rectifier and Li ion Battery Conne...

Page 59: ...pull on the physical connector termination or joint Connectors are IP65 rated when not accommodating installation cord or cable tension or pull At installation use only approved outdoor rated devices...

Page 60: ...ure the access panel is securely closed and the screws are torqued to 2 5 Nm 3 2 Wiring Considerations All wiring and branch circuit protection should follow the local national electrical building sta...

Page 61: ...ly CAN Alarm interface Load output interface 1 Battery interface Load output interface 2 Load output interface 3 Power input interface CAN Alarm interface Load output interface 1 Battery interface Loa...

Page 62: ...llation local codes and your specific site requirements 3 4 2 Positive Grounding As default the power system is not positive grounded Connect the grounding wire as shown in Figure 3 2 to ground positi...

Page 63: ...mm AC Input L N 2 5 mm2 L 12 mm AC Input PE 2 5 mm2 stud M3 PE 10 mm2 L 25 4 mm screw M6 L 25 4 mm or NOTE Terminals to be customer supplied 3 5 2 Quick Connect Version Table 3 2 Quick Connect Versio...

Page 64: ...gital Output DO Relay Functions The alarm relay contact configurations can be changed Refer to the following procedure Procedure 1 Refer to Opening Closing the Front Access Panel on page 75 and open t...

Page 65: ...This is for PG Gland Wiring version only 8 Conductor Cable 24 AWG to 26 AWG leads 4 PR DO s Recommended Shielded Twisted Pair STP Cable 2 Conductor Cable Battery Rectifier RS 485 Communication 24 AWG...

Page 66: ...Proprietary and Confidential 2022 Vertiv Group Corp 56 Figure 3 4 Strip insulation off the wires for RECTIFIER AC INPUT as required for PG gland version mm Figure 3 5 Strip insulation off the wires f...

Page 67: ...5 6 LOAD1 PG29 Cable Gland 13 20 2KW DC Output1 and Output1 BAT PG29 Cable Gland 13 20 2KW BAT Input Output2 and Output2 LOAD2 PG21 Cable Gland 9 16 1KW DC Output3 and Output3 LOAD3 PG21 Cable Gland...

Page 68: ...void sheath degrades 5 Tighten the screw of the terminal block as required 6 Tighten the caps of cable gland connectors as required Figure 3 8 Customer Wiring Connection Caps and Sealing pins OUT 1 OU...

Page 69: ...ct Terminal Refer to the illustrations in the following procedures Refer also to Table 3 4 Table 3 4 Designation for Customer Wiring Connection Designation Connector Acceptable Cable Outer Diameter Ra...

Page 70: ...rtiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 60 Power Input Interface Figure 3 9 AC Power 3 Terminal Input Interfac...

Page 71: ...lation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 61 Battery Load Output Interface 1 NOTE If the connector is not be used then the sealing pins and cap must not be removed Fig...

Page 72: ...nd User Manual Proprietary and Confidential 2022 Vertiv Group Corp 62 Load Output Interface 2 Load Output Interface 3 NOTE If the connector is not be used then the sealing pins and cap must not be rem...

Page 73: ...tiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 63 CAN and Alarm Interface DB15 Wiring Instruction Figure 3 12 DB15 Wir...

Page 74: ...al Output 1 Alarm output 3 Digital Output 2 Alarm output 4 Digital Output 2 Alarm output 5 Digital Output 3 Alarm output 6 RS485_2A The northbound interface to the NMS Network Management System 7 RS48...

Page 75: ...Vertiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 65 DB9 Wring Instruction Figure 3 14 DB9 Wiring...

Page 76: ...S485_1A The southbound RS485 interface to the LIB 2 RS485_1A The southbound RS485 interface to the LIB 3 4 5 6 CAN Communicate with other rectifiers for parallel installation 7 CAN Communicate with ot...

Page 77: ...are connected in parallel the battery protection is triggered for the unbalanced discharge current between the pre discharged batteries When connecting in parallel the following coefficients are requi...

Page 78: ...re IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 68 3 11 3 Rectifier and Battery Wire Diagram Figure 3 17 Rectifier and Battery W...

Page 79: ...to Figure 3 18 for DIP switch location NOTE System with multi batteries is only applicable for EMEA region Please find your local sales agent for detail information 3 12 2 Power Switch The power rocke...

Page 80: ...the unit NOTE You only need the Micro SIM card if you are using NB IoT 1R482000C2 1 only Procedure 1 Refer to Opening Closing the Front Access Panel on page 75 and open the rectifier enclosure front...

Page 81: ...re to turn Bluetooth in the rectifier ON or OFF Procedure 1 Refer to Opening Closing the Front Access Panel on page 75 and open the rectifier enclosure front access panel 2 Refer to Figure 4 2 and set...

Page 82: ...door Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 72 4 3 Antenna Installation For R48 2000C2 1 Only See Figure 4 3 Figure 4 3 Antenna Installation Tighten...

Page 83: ...osition apply AC input power to the rectifier by closing the external AC disconnect or protective device The rectifier starts automatically 3 Apply battery power to the system by placing the battery O...

Page 84: ...nal Figure 6 1 Local Indicator Locations Table 6 1 Local Indicators Indicator Color Normal State Fault State Fault Cause Status Green On Off No operation power supply Observation Alarm Yellow Off On T...

Page 85: ...ccess Panel Procedure 1 Rotate the access panel clockwise 180 around the hardware of the top left corner Refer to Figure 6 2 and Figure 6 3 Tighten the hardware circled in Figure 6 3 to secure the acc...

Page 86: ...rtiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 76 Figure 6 4 Close the Access Cover Tighten the screw as torqued 2 5...

Page 87: ...dependent on interference sources at the installation site The controller acquires batteries and rectifiers information analyses and processes these to monitor and manage the healthy operation of powe...

Page 88: ...id Version Android 4 4 and above Android Phone Screen size of 4 7 or larger Figure 7 3 APP Running on an IOS Device 7 3 2 Bluetooth APP General The controller provides a mobile wireless communication...

Page 89: ...ntent may be different according to the configuration system mode and system status Bluetooth Login Screen Supported Application Language English There are two account types Read Only and Read Write R...

Page 90: ...roup Corp 80 Figure 7 5 Privacy Policy Page Figure 7 6 Terms Conditions Page Bluetooth Connection Procedure 1 After logging into the controller via the App click Bluetooth Connection 2 A list of suppo...

Page 91: ...een 1 The Homepage screen includes a Menu Navigation and a System Status Information area see Figure 7 8 2 From the Menu Navigation area you can navigate to the other screens as shown below 3 From the...

Page 92: ...etting Swap Controller and About The Menu Navigation area appears in the Home screen Alarm screen Setting screen Swap Controller screen and About screen Home Icon When in other screens click on the Ho...

Page 93: ...Alarm Level Phase A Voltage Low OA Phase A Voltage High OA Phase B Voltage Low OA Phase B Voltage High OA Phase C Voltage Low OA Phase C Voltage High OA AC Freq Low OA AC Freq High OA Mains Failure MA...

Page 94: ...Response MA Alarm Block Level None MPPT Overwork Alarm None Setting Icon In the Menu Navigation area click on the Setting Icon to go to the Setting screen The settings are divided into Value Setting...

Page 95: ...les the ECO Mode Alarm Block When the outgoing alarms are blocked the alarms shall not trigger relay outputs The active alarms are continued to be displayed in the mobile app and in the Web pages Sele...

Page 96: ...gure 7 13 About Screen About Screen The About screen displays the Product Model Controller Revision Software Revision Serial Number and App Version System Status Information Rectifier Icon In the Home...

Page 97: ...al 2022 Vertiv Group Corp 87 Figure 7 15 Rectifier Information Screen Battery Icon In the Homepage screen click on the Battery Icon to go to the Battery screen Figure 7 16 Battery Screen Battery Infor...

Page 98: ...Vertiv NetSure IPE Series 48 VDC Outdoor Rectifier Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp 88 Figure 7 17 Battery Information Screen...

Page 99: ...C low voltage alarm setting Check why voltage is low Phase C Voltage High Voltage is above Phase C high voltage alarm setting Check why voltage is high AC Freq Low AC frequency is below low frequency...

Page 100: ...k that it is not caused by open AC input circuit breaker The system load is higher than rectifier capacity causing the batteries to discharge install additional rectifiers Rect Overload Output overloa...

Page 101: ...the rectifier should be replaced in its entirety No attempt should be made to troubleshoot or repair individual components inside the rectifier enclosure except fuse replacement 8 4 2 Rectifier Fuses...

Page 102: ...o hook the fuse that need to be replaced by the tool slot then pull it straight out of the fuseholder please refer to picture 2 Insert new fuse into tool slot please refer to picture3 Note that the ne...

Page 103: ...er Installation and User Manual Proprietary and Confidential 2022 Vertiv Group Corp Connect with Vertiv on Social Media https www facebook com vertivI https www instagram com vertiv https www linkedin...

Page 104: ...r registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness here Vertiv Group Corp assumes no responsibility and disclaims all liabilit...

Reviews: