Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
29
2.5
Mounting the Rectifier with a Lithium-Ion Battery to a Pole or Wall
Using Optional Rectifier/Battery Mounting Kit P/N 02236200 (Flag
Installation)
2.5.1
General
The rectifier and battery can be pole mounted or secured to a suitable wall (Flag Orientation) using optional rectifier/battery
mounting kit P/N 02236200. See “Mounting Kits” on page 20.
•
For wall mounting, the customer needs to supply four (4) wall anchors capable of supporting the weight of the rectifier
and battery.
NOTE!
If the rectifier’s front access panel is opened during installation, ensure the access panel is securely closed and
the screws are torqued to 2.5 Nm.
2.5.2
Pole Mounting Procedure
NOTE!
Torque all hardware to the values shown in the illustrations.
1.
Unpack the rectifier, Li-ion battery and mounting accessories.
2.
Install mounting brackets to pole. Refer to Figure 2.17.
3.
Install mounting brackets to Li-ion battery. Refer to Figure 2.18.
4.
Install mounting brackets to rectifier. Refer to Figure 2.19.
5.
Install Li-ion battery to pole. Refer to Figure 2.20.
6.
Install rectifier to pole. Refer to Figure 2.21.