Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
59
7.
Refer to “Opening / Closing the Front Access Panel” on page 75, and close the rectifier enclosure front access panel.
Torque the screws to 2.5 Nm.
3.10.2
Customer Wiring Connection Procedure for Quick Connect Terminal
Refer to the illustrations in the following procedures. Refer also to Table 3.4.
Table 3.4 Designation for Customer Wiring Connection
Designation
Connector
Acceptable Cable Outer Diameter Range
(mm)
Connect to
COM 1
DB15 COM
Quick Connector
8.5-10
4 x DO
COM 2
DB9 COM
Quick Connector
<5.5
CAN extension
LOAD1
2KW DC
Quick Connector
11 - 17
2KW BAT Input
&Output2-
LOAD2
1KW DC
Quick Connector
11 - 17
1KW DC
&Output3-
LOAD3
1KW DC
Quick Connector
11 - 17
1KW DC
&Output4-
PWR
AC
Quick Connector
10 - 16
AC Input
L+N+PE