STEP 31 Cont: o’clock positions respectively and re-tighten the lock nuts. Insert the
double bent end of the secondary air link through the hole in the tab end of
the thermostat coil. Insert the single bent end of the secondary air link
through the hole in the tab on the secondary air flap. Insert the secondary
air probe through the drilling in the stove back and secure with 1 each,
Phillips pan head machine screw (10-20x ¼”). Secure the secondary air
flap to the stove back with 1 each, Phillips pan head machine screw (10-
24x ¼”) and 1 each, shim ring. Tighten the screw securing the air flap
until snug and back off ¼ turn. Insure that the secondary air flap moves
up and down freely and that the flap rests at or near the closed position.
See figure A-8.
Fig. A-8
Positioning of Secondary Air Probe & Flap
STEP 32:
Install the secondary air cover plate. Secure with 2 each, Phillips pan head
machine head screws (¼-20x3/8”).
STEP
33:
Assemble and install the ash door.
Screw the socket, button head cap screw
into the stepped side of the pawl (see
Fig.A-9). Thread the hex nut onto the
end of the socket, button head cap screw
and tighten finger tight against the flat
side of the pawl. Screw the socket set
screw into the handle shaft drilling of
the pawl. Slide the ash door handle
shaft through its drilling in the ash door.
Slide the pawl onto the ash door handle
shaft so that the pawl offset is opposite
the handle curve (see Fig.A-9). Insure
that the pawl is against the ash door and
Fig. A-9
Ash Door Handle Assembly