STEP 4:
Place the ash lip on the stove bottom and secure with 2 each, socket flat
head machine screws (¼-20x ½”).
STEP 5:
Assemble the primary air regulator system. Place the primary air frame
face down on a flat surface (drilled bosses up). Thread the primary air rod
through the drilling in the bottom of the air valve and just start it into the
left top (hinge) drilling of the frame. Place the air valve and rod in the
frame so that the air rod hinge drillings are in alignment. Push the air rod
from left to right through
the aligned drillings and
secure the air rod in the air
frame with the 1/8”
friction clip (see Fig. A-1).
Turn the assembly over
and install the socket head
cap (adjusting) screw (¼-
20 x 3/8”) in the centre of
the air valve, finger tight.
Fig. A-1
Primary Air Regulatory
System Assembled
STEP 6:
Install the primary air regulator system on the cemented flange of the
inverted stove bottom with the hinged side down Fig. A-2 (protruding air
rod left). Secure with 2 each, Phillips round head machine screws (¼-20 x
5/8). Turn the stove bottom over onto its legs.
Cable Threading
Fig. A-2
Primary Air Regulator System Ready to be Installed
STEP 7:
Thread the running end of the primary air thermostat cable down through
the small hole and up through the large hole in the air valve and thread it
through the small hole in the centre of the air valve. Pull 6”-8” of cable
outside the valve and tighten the set screw finger tight (see Figures A-1 &
A-2).