Dura 65
9 | Page
Version 1.0v-05/2021
© Verder International B.V
4.3 Layout
Figure 3 Layout Dura 65 (Generic View)
4.4 Bearings and Lubrication
u
Pump: To be filled at installation with appropriate
lubricant if not supplied pre filled.
(
g
Appendix A )
u
Bearings are sealed units and need no additional
lubricant.
u
Grease the g
earbox adaptor/bearing carrier through the
grease nipple. (
g
7.2.3 Maintenance Schedule)
Pump Layout – Exploded view Dura 65
1
2.1
3
2.2
10
11
1
Front Cover Inspection Window
and Gasket
2
Front Cover Assembly
2.1 Filler Port
2.2 Service Cover
3
Drive Coupling and O-Ring
4
Shims Pack
5
Rotor Shoe Assembly
6
Rotor Assembly
6.1 Bearing Seal Kit
6.2 Bearing Kit
7
Port Flange Assembly
8
Gearbox Adaptor/ Bearing Carrier
9 Frames
10 Pump Housing
11 Hose
12 Motor
8
6.2
2
6
4 5
7
9
12
6.1