![Verderflex Dura 65 Original Operating Manual Download Page 10](http://html1.mh-extra.com/html/verderflex/dura-65/dura-65_original-operating-manual_1003795010.webp)
Dura 65
10 | Page
Version 1.0v-05/2021
© Verder International B.V
5 Installation and Connection
Material damage due to unauthorized modification
on pump!
u
Unauthorized modification will invalidate the warranty.
5.1 Preparing for Installation
5.1.1 Checking the Ambient Conditions
1. Make sure that the operating conditions are complied
with (
g
Appendix A).
2. Make sure the required ambient conditions are fulfilled
(
g
Appendix A).
5.1.2 Preparing the Installation Site
u
Ensure the installation site meets the following
conditions:
–
Pump is freely accessible from all sides.
–
Sufficient space is available for the installation/
removal of the pipes and for maintenance and
repair work, especially for the removal and
installation of the hose.
5.1.3 Preparing the Foundation and Sur-
face
u
Make sure the foundation and surface meet the
following conditions:
–
Level
–
Clean (no oil, dust or other impurities)
– Capable of bearing the weight of the pump and all
operating forces
–
Ensure the pump is stable and cannot tip over
–
Concrete foundation: Standard concrete strong
enough to support the pump under load.
5.2 Installation at Site
1. Lift the pump. (
g
3.1.2 Lifting)
2. Put the pump down at the installation site.
3. Bolt the pump down; use all 4 holes.
CAUTION