PURELAB Option-S 7/15 US Operator Manual
ELGA
Page 14
PURELAB Option-S 7/15 US Version 1 08/14
Step 2 - Connect Electrical Supply
1. PLUG mains lead into the socket on the left hand
side of the
PURELAB Option-S US
unit.
2. PLUG mains lead into mains socket.
Step 3 - Connect High/Low Level Switch to Reservoir
1. INSERT jack plug into the level control socket
located at rear of unit and reservoir.
Mains power socket
Fuse
ON/OFF
switch
Mains power lead
Electrical Connections
Level control
Reservoir Level Connections