139
TO M-14P MS
TASK CARD No. 265
M.S. ITEM 080.00.00f
procedure: Washing of Compressor Delivery Valve
OPERATIONS AND TECHNICAL REQUIREMENTS
CORRECTIVE ACTIONS
CHECKED
BY
1. Remove the compressor delivery valve.
2. Disassemble the valve and clean the valve parts of coking products. Wash with
gasoline and blow with dry compressed air.
3. Assemble the valve and reinstall it.
Install new gaskets AK-05001, AK-05002 and AK-05003 taken from the individual
SPTA set.
TEST EQUIPMENT
TOOLS AND FIXTURES
MATERIALS
Wrench 700880-7
Gasoline Nefras-S 50/170 or
BR-1, BR-2
Gaskets from individual SPTA set Air,
compressed
Summary of Contents for M-14P
Page 6: ...19 Engine M 14P Front View Figure 1...
Page 7: ...20 Engine M 14P Rear View Figure 2...
Page 27: ...40 Arrangement of Airborne Tools in Case Figure 1...
Page 39: ......
Page 44: ...57 Engine M 14P Test Run Chart Figure 201...
Page 67: ...80...
Page 163: ...176 Crankshaft Thrust Ball Bearing Front Cover Figure 1 Intermediate Crankcase Figure 2...
Page 166: ...179 Intermediate Grankcase Front Portion Figure 3 Intermediate Crankcase Rear Portion Figure 4...
Page 173: ...186 Front view Cylinder Figure 1 Rear view...
Page 180: ...193 Timing Mechanism Schematic Diagram Figure 6 Cam Plate Figure 7...
Page 189: ...Blower Longitudinal Section View Figure 1...
Page 191: ...Rear view Mixture Collector Figure 2 Diffuser Figure 3...
Page 194: ...1 Plate 2 Spring 3 Plate 4 Gear 5 Accessory Drive Shaft Blower Coupling Figure 4...
Page 204: ...Oil Sump Figure 4...
Page 216: ...Engine M 14P Gear Train Figure 1...
Page 247: ...Carburetor AK 14P Operation Diagram Figure 1...
Page 249: ......
Page 274: ......
Page 282: ......
Page 283: ......
Page 288: ...T t en 0 CO 0 T K D fi h0 Ol f 01 3 0 F4...
Page 293: ......
Page 344: ...Generator Electrical Connection Diagram Commutator Side View Figure 3 1 Main Pole 2 Interpole...
Page 355: ......
Page 358: ......