Required Daily Procedures
Required daily procedures include:
❑
“Installation and Initial Setup Procedure” on page 3-2
❑
“Tuning Adjustments and Calibration Check” on page 3-4
Installation and Initial Setup Procedure
Complete this procedure at each startup:
1. Make all mechanical and electrical connections to the component parts of the leak
detector.
2. Start the mechanical pump that is connected to the discharge line of the high vacuum
pump.
3. Verify the control settings on the secondary panel of the console as shown on the
Factory Calibration Data Sheet “990 CLD Leak Detector Factory Calibration Data” on
page 2-xvii.
4. Move the MAIN POWER switch to the ON position.
The spectrometer tube pressure gauge must measure upscale. If the meter does not
measure upscale:
a. Turn off the MAIN POWER switch.
b. Check the connections to the COLD CATHODE high voltage SHV connector on
the rear panel.
c. Check the connections on the cold cathode gauge itself.
5. Verify that the fan on the high vacuum pump starts and that the HIGH VAC PUMP
READY LED is lit.
If neither of these actions occur within two minutes:
a. Turn off the MAIN POWER switch.
b. Check the connections to the HIGH VACUUM PUMP connector on the rear
panel.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com