03-914998-55:6
22 of 63
The system should be conditioned for at least 10 - 24 hours, before proceeding
with meeting system specifications. Ideally, the system should be conditioned
overnight. Hydrocarbon and water background levels can be expected to
continue to decrease even after the initial bakeout. During conditioning, some
familiarization could be done with the operator.
NOTE: After bakeout, reset the manifold bakeout temperature to 80 °C and click
Save
. A manifold bakeout temperature of 110 °C is appropriate for the initial
bakeout that lowers the water level in the system. Additional bakeouts will likely
be done to lower the level of volatiles in the system and this can be achieved
with a manifold temperature of 80 °C. Repeated manifold bakeouts at higher
temperatures are to be avoided as they can potentially degrade system
performance.
Summary of Contents for 4000 GCMS
Page 4: ...03 914998 55 6 4 of 63 This page intentionally left blank...
Page 10: ...03 914998 55 6 10 of 63 This page intentionally left blank...
Page 14: ...03 914998 55 6 14 of 63 Click Finish to close the wizard Figure 2 3...
Page 17: ...03 914998 55 6 17 of 63 Figure 2 6...
Page 18: ...03 914998 55 6 18 of 63 Figure 2 7...
Page 25: ...03 914998 55 6 25 of 63 Figure 3 2...
Page 27: ...03 914998 55 6 27 of 63 Figure 3 4 Figure 3 5...
Page 30: ...03 914998 55 6 30 of 63 Figure 3 8...
Page 34: ...03 914998 55 6 34 of 63 This page intentionally left blank...
Page 40: ...03 914998 55 6 40 of 63 Figure 5 6...
Page 41: ...03 914998 55 6 41 of 63 Figure 5 7...
Page 42: ...03 914998 55 6 42 of 63 Figure 5 8...
Page 50: ...03 914998 55 6 50 of 63 This page intentionally left blank...