Commissioning
Radar Tank Gauge
70
Installation and Operations Manual
6.7
Mounting calibration with the ToF Tool
To carry out the basic setup with the ToF Tool operating program, proceed as follows:
• Start the ToF Tool operating program and establish a connection
• Select the "mounting calibr." function group in the navigation bar
The following display appears on the screen:
Mounting calibration step 1/2:
• auto correction (description see page 57)
• pipe diam. corr. (description see page 58)
Note!
• Each parameter that is changed must be confirmed with the
RETURN
key!
• the "
Next
" button moves you to the next screen display:
change to next page
Summary of Contents for 7532
Page 31: ...31 7532 Operation 5 Operation 5 1 Quick operation guide...
Page 44: ...Operation Radar Tank Gauge 44 Installation and Operations Manual...
Page 46: ...Commissioning Radar Tank Gauge 46 Installation and Operations Manual 6 3 Basic Setup...
Page 72: ...Commissioning Radar Tank Gauge 72 Installation and Operations Manual...
Page 74: ...Maintenance Radar Tank Gauge 74 Installation and Operations Manual...
Page 76: ...Accessories Radar Tank Gauge 76 Installation and Operations Manual...
Page 77: ...77 7532 Troubleshooting 9 Troubleshooting 9 1 Troubleshooting instructions...
Page 91: ...91 7532 Appendix 11 Appendix 11 1 Operating menu HART Display modul ToF Tool...
Page 105: ...7532 IOM027FVAE0804 105 Notes...