www.Valtir.com
13
Revision B December 2022
Position the Vulcan
TM
Barrier Sections
Locate anchor straps at panel connection points as shown in Figure 5 when anchoring
each barrier section.
Use the Anchor Straps as templates to drill anchor holes. Refer to Figure 6 and
instructions contained in the MP-3
®
Polyester Anchor box supplied with the system (or
equivalent anchoring options) for detailed anchoring instructions.
Figure 5 - Anchor Strap Locations
Figure 6 - Anchoring the System
ANCHOR
Summary of Contents for Vulcan Barrier System CEN
Page 1: ...PN 617902 REVISION B DECEMBER 2022 VulcanTM Barrier System CEN ASSEMBLY AND ANCHORING MANUAL...
Page 8: ...www Valtir com 7 Revision B December 2022 Figure 1 Freestanding Configuration Not H2...
Page 9: ...www Valtir com 8 Revision B December 2022 Figure 2 Anchored Configuration...
Page 10: ...www Valtir com 9 Revision B December 2022 Figure 3 Anchored Configuration...
Page 11: ...www Valtir com 10 Revision B December 2022 Figure 4 Freestanding End Treatment...
Page 20: ...www Valtir com 19 Revision B December 2022 Assembly Drawing 616960 Sheet 2 Vulcan 12m...
Page 21: ...www Valtir com 20 Revision B December 2022 Assembly Drawing 616960 Sheet 3 Vulcan 12m...
Page 22: ...www Valtir com 21 Revision B December 2022 Assembly Drawing 616960 Sheet 4 Vulcan 12m...
Page 24: ...www Valtir com 23 Revision B December 2022 Assembly Drawing 616961 Sheet 2 Vulcan 4m...
Page 25: ...www Valtir com 24 Revision B December 2022 Assembly Drawing 616961 Sheet 3 Vulcan 4m...
Page 26: ...www Valtir com 25 Revision B December 2022 Notes...
Page 27: ...www Valtir com 26 Revision B December 2022 Notes...