
Calibrating the LigaSure Generator
6-18
LigaSure Vessel Sealing Generator Service Manual
Step 1 – Verify LigaSure Generator Data
A.
From the serial port on the LigaSure generator, establish RS-232
communications as described on page 6-9, then verify LigaSure generator
data.
B.
Plug a footswitch into the bipolar footswitch connector on the rear panel.
C.
Enter the command
#cal
. This should start calibration mode.
D.
Press Enter on the terminal to increment the calibration steps. You can pass
over any step, but you must perform steps 4 (Isns), 5 (Vsns), and 6 (ECON) in
order.
E.
Whenever a calibration step calls for keying the generator, press the
MACROBIPOLAR (left) pedal on the footswitch.
F.
Follow the step instructions shown on the computer monitor.
G.
To exit calibration mode, turn off generator power, then turn it back on.
Step 2 –
Adjust the Calendar
A.
Refer to the following table for the commands to adjust the date.
B.
When the current date is correct, press Enter to proceed to the next step.
Month
Day
Year
y: month + 1
u: day + 1
i: year + 1
Y: month + 10
U: day + 10
I: year + 10
b: month - 1
n: day –1
m: year - 1
B: month – 10
N: day - 10
M year - 10
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com