Setup
Before setting up the VRI-iS constants verify and/or obtain the following.
• Verify that the GPS position is set up.
• Determine the minimum flow rate. The minimum flow rate is determined by the pump curve and hydraulics
of the center pivot.
• Determine the maximum pressure setting. The maximum pressure setting is determined by the pump curve
and hydraulics of the center pivot. If there is an underground pipeline it is recommended that the setting be
10% below the pressure rating of the pipeline. Contact the pump supplier for guidance.
• Continue with one of the Setup procedures listed below:
ICON5 / ICONX .......................................................................................................................................... 32
ICON10 / ICON1 ........................................................................................................................................ 38
31
Setup
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...
Page 102: ...102 Parts This page was left blank intentionally...