25
Installation Instructions
Setup Control Panel for GPS Position
ICON10 / ICON 1 - Set Current Method
9. Set the Run Time Fallback Position. See Figure
25-1.
(a) Push
Position Loss Setup.
(b) Check the
Runtime Fallback Position
checkbox.
(c) Select the
LRDU Pivot Speed
field.
(d) Enter the pivot speed. The default is 15.56 ft/
min (4.732 m/min) and push
Enter
.
(e) Select the
Length to LRDU
field.
(f) Enter the pivot length. The default is he de-
fault is 1320 ft (402.3 m) and push
Enter
.
(g) Push the
Home
button to go back to the
Main Screen.
10. Continue with Remove GPS Position Tower Box
on the next page.
2
3
4
1
10
Figure 25-1 1. Position Loss Setup
2. Runtime Fallback Position
3. LRDU Pivot Speed
4. Length to LRDU
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...
Page 102: ...102 Parts This page was left blank intentionally...