ICON5 / ICONX (Continued)
Test Valve Operation
29. Set percent timer to 0.0% (zero percent), to keep
machine from moving.
30. Turn water on to verify valve operation.
31. Push a
Start
button to start the machine, ensure
machine is locked in and running, but not moving.
32. Do the following to verify that each valve is work-
ing:
Use the sequence valves feature. See Figure 37-1.
(a) Push
Menu, Programs,
and
VRI
to display
the VRI-iS screen. See Figure 37-1.
(b) Push the
VRI-iS Diagnostics
button.
(c) Push the
Sequence Valves
button to test
valve operation.
This feature will turn all valves on, and then
turn each valve off for 5 seconds, in se-
quence, beginning with valve 1 and ending
with the last valve.
The technician can follow the pipeline from
pivot point to LRDU and verify that each
valve turns off and on.
(d) When prompted to initiate valve sequencing,
push the
Yes
button.
• If the valves work correctly installation is
complete.
• If the valves do not work correctly, verify
proper installation of valves, valve connec-
tions and dip switch settings.
1
2
3
Figure 37-1 1. VRI-iS Diagnostics
2. Sequence Valves
3. Yes
37
Setup
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...