![Valley Rainger Linear Owner'S Manual Download Page 99](http://html1.mh-extra.com/html/valley/rainger-linear/rainger-linear_owners-manual_3240098099.webp)
Rainger Linear 99
TROUBLESHOOTING
Tower Behind Shut Down
In a tower behind shut down, the tower which is out of line and the farthest behind, fails to run and breaks the
safety circuit.
!
WARNING
• TO REDUCE THE POSSIBILITY OF STRUCTURAL DAMAGE, NEVER OPERATE THE MACHINE IN
THE SAME DIRECTION OF TRAVEL AS THE MACHINE WAS OPERATING WHEN THE SHUT DOWN
OCCURRED. AFTER MACHINE IS REPAIRED, ALWAYS OPERATE IN THE OPPOSITE DIRECTION
OF TRAVEL AS THE MACHINE WAS OPERATING BEFORE THE SHUT DOWN. WHEN THE MACHINE
COMES BACK INTO ALIGNMENT THE DIRECTION CAN BE CHANGED.
Tower behind shut downs typically occur because of a failure in one or more of the following areas; tower box,
drive train or machine alignment. Use the flow chart below to determine if the cause of shut down is mechanical.
Refer to the operation pages of this section or the control panel Owners Manual for other TROUBLESHOOT-
ING information.
DIRECTION
OF TRAVEL
TOWER BEHIND SHUT DOWN
IS THE TRAILING TOWER STUCK IN
WHEEL TRACK?
IS THERE A FLAT TIRE ON TRAILING
TOWER?
IS THERE U-JOINT FAILURE ON
TRAILING TOWER?
DID A GEAR BOX FAIL?
NO
YES
DID THIS CORRECT THE
PROBLEM?
NO
YES
REPAIR OR REPLACE
GEAR BOX
NO
YES
DID THIS CORRECT THE
PROBLEM?
NO
YES
REPAIR U-JOINT
NO
YES
DID THIS CORRECT THE
PROBLEM?
NO
YES
REPAIR TIRE
NO
YES
DID THIS CORRECT THE
PROBLEM?
NO
YES
FILL IN WHEEL TRACK
WITH DRY SOIL
TOWER BOX SWITCH PIVOT ARM
BOUND UP?
NO
YES
CALL VALLEY DEALER
CALL VALLEY DEALER
Summary of Contents for Rainger Linear
Page 2: ...2 Rainger Linear This page was left blank intentionally...
Page 6: ...6 Rainger Linear TABLE OF CONTENTS This page was left blank intentionally...
Page 36: ...36 Rainger Linear OPERATION This page was left blank intentionally...
Page 58: ...58 Rainger Linear OPERATION This page was left blank intentionally...