Appendix
0020244995_02
ecoTEC
pro
Installation
and
maintenance
instructions
41
G
Commissioning Checklist
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
completed in full.