Installation 5
0020217119_01 aroCOLLECT Installation and maintenance instructions
13
≤ 10m DN 40*
> 10m ≤ 30m DN 50*
A
B
A
B
*
= one way
▶
Connect the air/brine collector in accordance with the
Tichelmann principle. This means that the air/brine col-
lector with the shorter flow has the longest return.
Caution.
Risk of material damage caused by a leak.
When tightening screwed connections,
ensure that O-rings are inserted correctly
as, otherwise, they may pop out or become
jammed, become damaged, or cause leaks.
▶
Insert the O-rings properly and untwisted
into the cap nuts for the air/brine collect-
or's brine connections.
▶
Screw the cap nuts to the connection adaptors on the
"hot brine" and "cold brine" brine lines in the brine circuit
(cross-reference) on the mounting base.
▶
To purge each individual air/brine collector, install
two shut-off units.
5.7.2
Transporting the product
Caution.
Risk of material damage caused by incor-
rect transport.
▶
Do not transport the product using a hand
truck.
▶
If required, remove the louvred grill to prevent damage.
5.7.3
Installing the product
1.
Place the product on the base that is available as an
accessory.
2.
Connect the brine lines to the product as shown.
3.
Screw the product to the base.
5.7.4
Installing brine lines in the building
71
42a
65
48
64
56
62
61
63
70
72
A
B
A
B
≤ 10m DN 40*
> 10m ≤ 30m DN 50*
42a
Expansion relief valve
48
Pressure gauge
56
Heat pumps for brine
filling unit (accessory)
61
Stop valve
62
Stop valve
63
Stop valve
64
Stop valve
65
Brine collecting con-
tainer
70
Stop valve
71
Brine diaphragm expan-
sion tank
72
Stop valve