COMMISSIONING
80
5.5
Condition after the installation
DANGER!
An adequate grounding as per IEC 60204-1/ 60204-32 must be ensured after the in-
stallation of the profile!
WARNING!
The responsible assembly manager must check the system for the following parts or
situations after assembly and issue and sign an acceptance certificate!
►
Check the general functionality of the system.
►
Clearances of the line transitions and transfers.
►
Open spaces and interfering edges.
►
Random sample checking of tightening torques.
►
Correct connection and routing of the cables.
►
Check of the feed terminals and their wirings.
►
Have all required parts been installed safely and according to instructions.
►
Current collector units.
Summary of Contents for VCL Series
Page 95: ...INDEX 93 U Unloading 88...