TROUBLESHOOTING
Service Manual M4 - M10
11.07.2002
Page
44
F26
Check connections and cable in serial link
F26 PANEL COMMUNICATION
Clear fault memory
F26
Replace the control board with functioning one
according to instructions on section 9.3.6.
Replace defective parts as recommended in
spare part lists
Load software into Control board according to
instructions on section 12 and set parameters
Plug functional panel in place
YES
NO