PREPARATION FOR AUTOMATION OF
THE BASE
1.
Provide a foundation pit and arrange one or more conduits for
the passage of the electrical cabling.
2.
Assemble the 4 anchoring brackets on the mounting plate and
fasten with the 4 bolts provided.
3.
Pour the concrete into the inside of the pit and position the
base plate.
NOTE: verify that the plate is perfectly leveled and
parallel to the opening barrier.
4.
Wait for the complete setting of the concrete.
5.
Unscrew the 4 nuts that hold the base joined to the anchoring
brackets and position the rack on the plate.
NOTE: it is advisable to install the rack cabinet with the
inspection access flap turned towards the more
accessible side.
Summary of Contents for BY Series
Page 2: ......
Page 3: ...ISTRUZIONI 1 INSTRUCTIONS 29 NOTICES 57 INSTRUCCIONES 85 INSTRU ES 113 I GB F E P...
Page 4: ......
Page 16: ...ITALIANO 12...
Page 44: ...ENGLISH 40...
Page 72: ...FRAN AIS 68...
Page 100: ...ESPA OL 96...
Page 128: ...PORTUGU S 124...
Page 145: ......