2-2
Installation
>
Installing the main unit
[CONFIDENTIAL]
2 - 2 Installing the main unit
Installation procedures
(1) Unpacking and checking bundled items
Take out the main unit and accessories from the packing case.
Remove the tape and cushioning materials for packing from the main unit.
(1) Unpacking and checking bundled items
(2) Setup of a toner container
(3) Installing the waste toner box
(6) Connecting the Power Cable
Summary of Contents for CA-3100
Page 118: ...4 20 Maintenance Assembly and disassembly a d c f e e c ...
Page 131: ...4 33 Maintenance Assembly and disassembly a b c c d c ...
Page 134: ...4 36 Maintenance Assembly and disassembly c b a b ...
Page 146: ...4 48 Maintenance Assembly and disassembly Optional items a b c d ...
Page 148: ...4 50 Maintenance Assembly and disassembly Optional items a b c ...
Page 271: ... CONFIDENTIAL 2 IB 51 IB 51 Wireless Interface INSTALLATION GUIDE ...
Page 274: ...付録 Installation guide CONFIDENTIAL 3 IB 32B IB 32B IEEE1284 Interface INSTALLATION GUIDE ...
Page 282: ... CONFIDENTIAL 3 5 6 4 1 2 1 2 3 1mm 㟝㫴G㤵㣠 1 2 㛅 G㣙㾌 PF 3100 㦹㢨G㣰G㥐ᶤ ...
Page 283: ... Installation guide 6 HD 6 HD 7 HD 6 HD 7 INSTALLATION GUIDE ...
Page 285: ... Installation guide 7 CA 3100 CA 3100 INSTALLATION GUIDE ...