Page 53
U-BATCH™ TREATER
TREATING PROCESS FOR HYDRAULIC LIFT INSTALLATION
1. If the treater is not in the bottom position, go to the Load / Unload screen and press
the Lower Treater button and hold it for two seconds.
2. Lift a box of seed and position the gate over the center of the inlet hopper.
DO NOT open the gate.
3. From the Load / Unload screen, press and hold the Load Treater button for two
seconds.
4. After the mix motor reaches speed, open the gate on the pro box. Once all of the
seed is in the treater, press the load treater Stop button.
5. Lower the empty pro box to the ground and position it in front of the discharge
chute.
6. From the Load / Unload screen and press the Raise Treater button and hold it for
two seconds.
7. After the treater is in the top position, move the empty pro box under the discharge
chute.
8. From the Pump screen, press the Liquid Selection button and follow the popup
screens to select the chemical you wish treat the seed with.
9. From the Main screen, press the Start Setup button. Review the settings from
the Blend Setup screen. If any parameters need to be changed, press the Adjust
Settings button and make the changes. If you are not using any auxiliary pump
stands, set the time for Auxiliary 1 Run Time: and Auxiliary 2 Run Time: to zero.
Return to the previous screen, press and hold the Start Blend button for two
seconds.
10. After the batch run is complete, return to the Load / Unload screen. Press and hold
the Unload Treater button for two seconds and let the system run until all of the
seed is discharged to the empty pro box. Then press the unload treater Stop
button.
11. Remove the full pro box from under the treater and press the Lower Treater button,
hold it for two seconds. When it is in the bottom position you are ready to repeat
the process.
Summary of Contents for U-Batch
Page 12: ...Page 12 U BATCH TREATER Part 09 02 0003 Part 09 02 0001...
Page 13: ...Page 13 U BATCH TREATER Part 09 02 0010 Part 09 02 0009 Part 09 02 0012...
Page 60: ...Page 60 U BATCH TREATER NOTES...
Page 72: ...Page 72 U BATCH TREATER HOPPER SLIDE GATE BASE ASSEMBLY 12 04 0033 9 3 4 6 5 6 1 7 8 2 10...
Page 78: ...Page 78 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 A 26 35 39 36 23 D...
Page 81: ...Page 81 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 B DETAIL B 54 33 42...
Page 82: ...Page 82 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 8 4 11 7 3 50 56 48 12...
Page 83: ...Page 83 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 27 53...
Page 84: ...Page 84 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 57 52 68 58 64 62...
Page 88: ...Page 88 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 43 43 31...
Page 89: ...Page 89 U BATCH TREATER U BATCH TREATER BASE ASSEMBLY 13 11 0035 C 70...
Page 98: ...Page 98 U BATCH TREATER HYDRAULIC LIFT ASSEMBLY 05 05 0145 35 40 37 27 16 17 DETAIL A 4 3 3 4...
Page 102: ...Page 102 U BATCH TREATER HYDRAULIC LIFT ASSEMBLY 05 05 0145 B C...
Page 110: ...Page 110 U BATCH TREATER CONTROL PACKAGE ASSEMBLY 13 12 0145 6 2 4 1 3 4 2 5...
Page 112: ...Page 112 U BATCH TREATER U BATCH RIGID LEG TREATING SYSTEM 6 7 5 3 4 3 4 2 1 8...
Page 114: ...Page 114 U BATCH TREATER U BATCH WITH HYDRAULIC LIFT TREATING SYSTEM It 5 4 1 3 2 6...
Page 116: ...Page 116 U BATCH TREATER NOTES...