CO
2
MPACT ENDOSCOPIC INSUFFLATOR
®
SYSTEM Operator’s Manual
Page 25
MAINTENANCE CHECKLIST
Refer to Section 11.1 of this Operator’s Manual for instructions on how to perform each
item in the checklist below:
1.
Inspection of Mains or Power line cord
Pass
Fail
2.
High Pressure Hose Inspection
Pass
Fail
3.
Front Panel Rocker Switch Inspection
Pass
Fail
4a. Inspection of CO
2
Insufflation
Pass
Fail
4b. L/M/H Flow settings
Pass
Fail
4c. 30/60/120 Timer settings
Pass
Fail
5. Visual Inspection of Gas Outlet Connection
Pass
Fail
6. Inspection of Earth Leakage Current
Pass
Fail
Actual Reading ___________________
If for any reason, the integrity of the CO
2
MPACT ENDOSCOPIC INSUFFLATOR
®
SYSTEM is suspect as a result of these inspection steps, please call US Endoscopy
Customer Services to make arrangements for repair.
Tested By: _________________________
Test Date: ____________________
Unit Serial Number: #__________________________
Located on bottom of unit