1. GENERAL INFORMATION
1.1 INTRODUCTION
This manual provides the basic information necessary to install the GENISYS
II system and its
peripheral equipment (subject to completion of training by a US&S
-approved source). Topics
covered include equipment preparation, configuration and mounting, connection of operating
power, installation of plug-in boards, and typical printed circuit board external circuit interfaces.
For reference, related GENISYS II system manuals include:
SM-6900A - GENISYS II System Description
SM-6900C - GENISYS II System Startup, Troubleshooting, and Maintenance
SM-6900D - GENISYS II System Application Logic Programming
US&S
provides no shop maintenance procedures for the GENISYS II system circuit boards.
These boards are not repairable in the field.
1.2 R.A.I.L TEAM AND TECHNICAL SUPPORT
The Rapid Action Information Link (R.A.I.L.) team was created in
1996 to serve the technical needs of current and potential US&S
customers. Convenient 24-hour access and rapid resolutions to
customer problems are the trademarks of this organization. The
R.A.I.L. team, which is staffed primarily by US&S product and
application engineers, is ready to assist and resolve any technical
issues concerning the GENISYS II system or any other US&S
product.
Any questions regarding the contents of this service manual should
be directed to the R.A.I.L. team by telephone at 1-800-652-7276 or
through e-mail at [email protected].
1.3 HARDWARE GENERAL DESCRIPTION
The GENISYS II system consists of modular cardfile-mounted equipment and external peripheral
devices that are used to interface the cardfile circuitry to other associated interlocking control
systems. Sections 1.3.1 and 1.3.2 provide an overview of the hardware available for use in the
GENISYS II system.
Summary of Contents for GENISYS II
Page 4: ......
Page 6: ...GENISYS II System Hardware Installation UNION SWITCH SIGNAL 1 2 August 1999 SM 6900B Rev 0 0 ...
Page 12: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 ii August 1999 SM 6900B Rev 0 0 ...
Page 38: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 26 August 1999 SM 6900B Rev 0 0 ...
Page 40: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 ii August 1999 SM 6900B Rev 0 0 ...
Page 60: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 20 August 1999 SM 6900B Rev 0 0 ...
Page 62: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 ii August 1999 SM 6900B Rev 0 0 ...
Page 66: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 4 August 1999 SM 6900B Rev 0 0 ...
Page 67: ......