GENISYS II System Hardware Installation
UNION SWITCH & SIGNAL
1-6
August 1999
SM-6900B Rev. 0.0
3.
Install the necessary GENISYS II peripheral devices and make the necessary wiring
connections between the cardfile and external equipment.
4.
Make the necessary communications connections between the GENISYS II cardfile and other
remote train control equipment.
5.
Power up, configure, and test the GENISYS II system.
Steps 1 through 4 are detailed in this manual. Note that it may not be necessary to perform all of
these steps for all GENISYS II applications. Step 5 actually includes a number of system checks
and configuration procedures. This information is contained in Service Manual SM-6900C -
GENISYS II System Startup, Troubleshooting, and Maintenance.
Summary of Contents for GENISYS II
Page 4: ......
Page 6: ...GENISYS II System Hardware Installation UNION SWITCH SIGNAL 1 2 August 1999 SM 6900B Rev 0 0 ...
Page 12: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 ii August 1999 SM 6900B Rev 0 0 ...
Page 38: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 26 August 1999 SM 6900B Rev 0 0 ...
Page 40: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 ii August 1999 SM 6900B Rev 0 0 ...
Page 60: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 20 August 1999 SM 6900B Rev 0 0 ...
Page 62: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 ii August 1999 SM 6900B Rev 0 0 ...
Page 66: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 4 August 1999 SM 6900B Rev 0 0 ...
Page 67: ......