5: Maintenance
5-2
UPS469-01-00 PowerWAVE 3000T User Manual Dated 05-04-13
5.5
Battery Testing
The battery test takes approximately 3 minutes and should be performed only if:
• There are no alarm conditions
• The battery is fully charged
• The input mains supply is present
Battery testing can be carried out independently of the operating mode (Off-line or On-line) and whether or
not the load is connected.
The battery test procedure can be performed from the UPS front panel (See paragraph 4.3.5).
5.6
Battery Maintenance
The battery maintenance shall be done by an authorized Uninterruptible Power Supplies Ltd. Service
Partner.
5.7
Battery Disposal and Recycling
Batteries contain dangerous substances that will harm the environment if thrown away. If you change the
batteries yourself, call qualified organizations for battery disposal and recycling.
Summary of Contents for PowerWave 3000T
Page 1: ...Pioneering solutions for total power protection PowerWave PW 3000 T User Manual ...
Page 2: ......
Page 8: ...1 Safety 1 2 UPS469 01 00 PowerWAVE 3000T User Manual Dated 05 04 13 ...
Page 30: ...3 Installation 3 18 UPS469 01 00 PowerWAVE 3000T User Manual Dated 05 04 13 ...
Page 44: ...4 Operation 4 14 UPS469 01 00 PowerWAVE 3000T User Manual Dated 05 04 13 ...
Page 56: ...7 Options 7 8 UPS469 01 00 PowerWAVE 3000T User Manual Dated 05 04 13 ...